When a reservoir is bounded by one or more constant pressure boundaries, such as aquifer or gas cap, the main expectation of the production engineer is to delay the arrival of either water or gas into the well completed in the reservoir to optimize oil production. To achieve this expectation, it is important to understand fluid flow pattern through the reservoir system when oil is produced through the well.